Final site acceptance

Final Site Acceptance

Site pictureIntelli Towers offers to execute Final Site Acceptance if the current Site Supervision is executed by the client or a third party. Intelli Towers will control the complete installation from A-Z and prepare a report defining all checked items (and what needs to be changed if not accepted).

Tower SupplierThe report is confirming the correctness of:

  • The usage of the Geotechnical report
  • Choise of (or site specific design) foundation
  • Foundation measures
  • Installation of earthing
  • Installation of Power
  • Assembly of tower (alignment, joints and gaps)
  • Random bolt torque
  • Condition of tower galvanization
  • Installation of accessories
  • Installation of antennas, MW, cables & Equipment Fence (if needed)
  • Supplied documentation